Recipe: a Gantt-style plan

Tasks in work streams, a milestone, a kickoff the plan cannot start before, and undo. Drag a task to move it — also into another stream — drag its end to resize it, or use the keys (Alt + arrows).

Live example: Gantt-style project plan

Loading…

Run “Gantt-style project plan” on your own machine
  1. Make an empty folder and put this example’s two files in it:

    index.html — the page the code runs in, its markup and styles:

    <style>
      /* An item's class sets the token its fill reads: no specificity fight. */
      #timeline .phase-design { --tl-item-fill: #d6e4ff; }
      #timeline .phase-build { --tl-item-fill: #d8f3dc; }
      #timeline .phase-ship { --tl-item-fill: #ffe2c6; }
      .toolbar { display: flex; gap: 8px; align-items: center; padding: 6px 10px; border-bottom: 1px solid #d5d9de; }
    </style>
    <div class="toolbar">
      <button id="undo" type="button" disabled>Undo</button>
      <button id="redo" type="button" disabled>Redo</button>
      <span id="status" aria-live="polite">Drag a task to move it, drag its end to resize it.</span>
    </div>
    <div id="timeline" style="height: 380px"></div>
    

    main.js — the code, as it is in the editor now, your edits included:

  2. In a terminal in that folder, install the library and Vite (it lets the browser follow the imports), then start it:

    npm init -y
    npm install @temporeum/timeline-element
    npm install --save-dev vite
    npx vite
  3. Open the address it prints, http://localhost:5173/.

How it is made

  • Streams are lanes, tasks are items with a laneId, and the milestone is an item without an end: an instant, which covers its day (granularity: "day").
  • Colour per stream is a class on the item that sets the fill token: className: "phase-design" and #timeline .phase-design { --tl-item-fill: #d6e4ff; }. See theming.
  • The kickoff is a rule, not a check afterwards. canMove is asked before every step of a move or a resize, by pointer and by key, and a false holds the item where it was.
  • Undo is the command's inverse. The timeline emits one command per edit; the page keeps two stacks.
  • Decorations draw what is not an item: banding stripes the weeks, a marker calls out the kickoff on the axis, an era shades the code freeze behind the tasks.
  decorations: [
    { kind: "banding" },
    { kind: "marker", id: "kickoff", time: KICKOFF, label: "Kickoff" },
    { kind: "era", id: "freeze", start: at(31), end: at(35), label: "Code freeze" },
  ],

From the running example example/recipe-gantt

Arrows, progress and a task table

This recipe draws the plan with decorations and rules. Dependency arrows, progress, baselines, milestone diamonds and a task table beside the chart are built in: see Gantt charts. The scheduler puts tasks back in order and finds the critical path when you call it; nothing reschedules on its own — canMove can refuse a move that would break an order, and a command handler can call the scheduler.